Project case study / Smeaton Grange, NSW
Coles–Linfox Distribution Centre
A coordinated metal-recovery program for a large industrial demolition.
5,210 tmetal recovered
4,800 tferrous steel
410 tnon-ferrous metals
61,281 m²building area
The challengeA recovery plan
A recovery plan
built around the site.
Changing site access, staged demolition and bulky structural material called for a recovery plan that could move with Central Civil’s program.
One coordinated approach.
- Assess material locations, access routes and constraints.
- Separate ferrous and non-ferrous streams as work progressed.
- Process oversized steel with rotating shear and oxy-cutting support.
- Coordinate transport and collections with demolition milestones.
The recovery outcome.
The project converted demolition material into organised, transport-ready recovery streams, with processing and collections coordinated around the site program.
Keep exploring
More of our work
Toyo Tyres industrial demolition
Structural steel recovered as the former Toyo Tyres facility made way for a logistics precinct.
North Strathfield
Staged industrial demolition beside occupied residential buildings.
Former Woolworths complex
Steel structures dismantled and scrap recovered from a constrained suburban site.