Project case study / North Strathfield, NSW
North Strathfield
Staged industrial demolition beside occupied residential buildings.
190 tmetal recovered
28 hTop Dollar working time
36 texcavator
2021project delivery
The challengeA recovery plan
A recovery plan
built around the site.
Two industrial complexes sat close to residential boundaries, with restricted operating hours and retaining-wall engineering requirements that changed the demolition sequence.
One coordinated approach.
- Cut and clear the first steel-framed complex in a staged sequence.
- Provide access for engineers to strengthen the retaining-wall boundary.
- Use a 36-tonne excavator with rotating shear and mechanical grab.
- Coordinate loading and transport around restricted residential working hours.
The recovery outcome.
Approximately 190 tonnes of scrap metal were recovered. Top Dollar’s on-site recovery work totalled 28 hours across the staged project.
Keep exploring
More of our work
Coles–Linfox Distribution Centre
A coordinated metal-recovery program for a large industrial demolition.
Toyo Tyres industrial demolition
Structural steel recovered as the former Toyo Tyres facility made way for a logistics precinct.
Former Woolworths complex
Steel structures dismantled and scrap recovered from a constrained suburban site.
It starts with a conversation
Request a site assessmentLet’s keep your next project moving.
You don’t need to know every grade. Tell us about your material and we’ll help you work out the next step.